Profile for asdfaas5110

Username:
asdfaas5110
Name:
 
avatar
 

Details about asdfaas5110

Homepage:
http://www.ruijie-steelpipe.com/scaffolding/
Sex:
not specified
Location:
Biography:
Scaffolding Product Description
We are a scaffolding manufacturer and trading company. With 13 years experience in scaffolding industry, our market has covered
around 60 countries.
Main products are Ringlock System, Metal Plank, Steel Formwork,Kwikstage System, Cuplock System, Frame System, Scaffolding Tubes, Couplers, Screw Jacks, Ladder Beam, Props, Hardware and Scaffolding Accessories.
1.One-stop service, solve the problem of purchase many kinds goods at one time.
2.Ringlock production 20,000-25000 tons/month.Metal plank: export 400 containers/month. Ensure delivery timely.
3. The plant is located in the northern steel base and near port, production and transportation costs are low.
4. Specialist is responsible for order follow-up, from sending samples to receiving bulk goods.
Product Specification
ITEM NO.Closed Length(mm)Open Length(mm)Reference Weight(kg)Work Bearing Capacity
SLMP-D251450250015.120kN
SLMP-D301800300017.120kN
SLMP-D352000350018.920kN
SLMP-D402200400022.220kN
SLMP-D502820500035.220kN
SLMP-E301800300020.030kN
SLMP-E35 2000350024.330kN
SLMP-E402200400026.830kN
Detailed Pictures
1. Scaffolding adjustable Steel prop consists of outer tube, inner tube, prop nut, top plate and base plate, tripod is optional.
2. Adjustable Steel Prop is fast to build up,which can save 60% time and manpower than traditional scaffolding.
3. Scaffolding adjustable Steel Prop is designed to support a range of floors and temporary beams, it is more stable and reliable.
4. The Scaffolding adjustable Steel Prop is easy to assemble and dismantle; It can be adjusted to different length within its range.
5. We can produce different kinds of adjustable shoring prop as the customers' requirement like drawing, sample etc.
Screw Part
There are two kinds of threading part. One has welding joint and the other one without welding joint, which is screwing directly on the outerside tube.
Factory Processes
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Customers and Exhibition
Related Product:
acrow prop
steel scaffold props
steel prop scaffolding
scaffolding prop adjustable
scaffolding prop
FAQ:
Q1: Where is the loading port?
A: Tianjin Xin port
Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.
Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.
Q4: Can I get some samples?
A: Yes, Sample is free, but shipping cost is on your side.
Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.
Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.Scaffolding
website:http://www.ruijie-steelpipe.com/scaffolding/

Miscellaneous

Contact asdfaas5110

E-mail
PM:
Send private message
 

user statistics

Date registered
04.10.2023
Latest activity
04.10.2023
# of posts
0 | Search for posts from asdfaas5110

asdfaas5110's Latest activities

04.10.2023:
Last online
no activities yet

asdfaas5110 has not tagged any elements to the user profile


Sign up, to leave a comment
Xobor Forum Software ©Xobor.de | Forum erstellen
Datenschutz